The repointing scope
Paranis was tasked with repointing all the stone buttresses involved in this Alexandra Bridge project. The masonry setting, spanning the Ottawa–Gatineau connection, made the work distinct from a typical building façade repair.
What We Do / Featured Restoration
Ottawa / Gatineau
Heritage masonry.
An exceptional setting.
Stone buttress repointing on the interprovincial Alexandra Bridge called for work both above and below the water surface, with substantial stone handled from barges.
Explore Project Photos
Restoration / Paranis ConstructionThe project
In a project involving the interprovincial Alexandra Bridge, Paranis was tasked with repointing all the stone buttresses. Deep-sea diving skills were required to work on the leading joints below the surface of the water. Large stone blocks were moved off barges using a pulley system.
A closer look
Explore the photographs from this Alexandra Bridge project.
Inside the case study
Paranis was tasked with repointing all the stone buttresses involved in this Alexandra Bridge project. The masonry setting, spanning the Ottawa–Gatineau connection, made the work distinct from a typical building façade repair.
The project required deep-sea diving skills to work on the leading joints beneath the water surface. Access to those joints was an essential part of carrying out the repointing scope.
Large stone blocks were moved off barges using a pulley system. Handling the stone and reaching the work areas were integral parts of the project, alongside the masonry work itself.